Table 1

Field inspection, testing and monitoring data for catalyst-tube assembly and selection of test-samples for lab investigation.

Tube no. Field − testing/inspection/monitoring data Selected samples for lab investigation


  Cat. ΔP (psi) Tube perimeter (mm) Short piece bulge (%) Tube-skin temp. (TMT) For various studies (size and macro- and micro-structure) For creep study

    Top Middle Bottom     Part of catalyst tube assembly Part of catalyst tube assembly
Catalyst tube assemblya
RC-28 21 419.0 419.5 420.9 7.1 CT (bottom part) X
RG-21 36 414.5 414.8 414.3 6.5 High CT (bottom part), S.P. and P.T. X
RG-42 21 413.2 413.5 414.3 11.4 CT (all parts) CT (top and bottom part)
RI-1 8 415.4 418.8 420.2 4.3 CT (bottom and middle parts) CT (bottom part)
RE-29 26 416.1 415.1 415.0 1–2 High CT (bottom part), S.P. and P.T. S.P.
RC-30 18 418.0 417.9 417.5 6.4b S.P. and P.T. X
RC-33 14 419.8 419.1 418.2 3–4 CT (bottom part), S.P. and P.T. S.P. and P.T.
RE-35 16 416.8 416.2 415.2 2–3 High CT (bottom part), S.P. and P.T. S.P.
RG-8c 7 417.0 418.5 418.5 0–1 CT (all parts), S.P. and P.T. S.P. and P.T.
Hot-collector
Hot collector no. Not applicable H1, H2 and H5d H5d
a

Catalyst tube assembly includes: catalyst tube (CT), short piece (S.P.) and pig tail (P.T.).

b

Remarkable bulge was noticed on the pig tail.

c

Tube studied for reference and integrity-assessment considering being in good condition.

d

Hot-collector which suffered leakage.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.