Open Access

Table 3

Number of nodes for each section of the geothermal EAHE.

Section Symbol Nodes
Pipe diameter Ny2, Nx2, Nx4 71
Distance from the ground surface to the pipe Ny3 101
Length of the soil layer after the pipe Ny1 41
Length of the soil layer around the vertical pipes Nx1, Nx5 21
Length of the pipe Nx3 101

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.