Open Access
Fig. 8

Download original image
Diagram of the manufacturing process for contacts A and B. The parts are obtained by passing the strip through the tool 1 (blanking) and then the tool 2 (bending and blanking/shearing). The 2 contacts differ only in the length of the arm between the two ends. Only contacts B is considered for the rest of the study.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.